Our Projects

 

Biomass Power Plants

 

SOLAR CENTAUR 50 (T5701) CHP PLANT 

CTG-SPT-1034 

Plant erected in 1992 and moved/overhauled in 1988. Turbine replaced with zero-hour unit in 2004. Turbine has 29,000 operating hours. Leroy-Somer generator overhauled in 2004 and new bearings were installed. 4280kW, p.f. 0.8, 10.5kV, 50Hz. Plant comes with controls, transformer, acoustic housing, fire system, compressors, HRSG, and economizer. FOB Europe. As Is/Where Is.

 

 

 

 

Download Techical Specifications

 

Steam Turbine Generator Sets & Boilers

 

1964 13MW BROWN BOVERI BACKPRESSURE STEAM TURBINE GENERATOR SET

CTG~STNC-2024

Taken offline in Sept 2008, 325,396 running hours, well maintained B-44508, Type: DGSSF 2D 2V, 13,375 KW, 1250 PSIG, 950 deg F, 7500 / min, 

GENERATOR:1964 Brown Boveri: WT-550 B67354, 15800 KVA, max 18,000 kva, 3600 RPM , 6900 V 1325A, 0.85 100Ve Ae 382, exciter = 56, kws=121, 3 ph 60hz, Comes with all related equipment and spare parts are available . 

All manuals, drawings, Maint Records, etc all located at power plant. Maintained right up to shutting down and only shut down due to contract for steam not renewed.

 

 

Download Technical Offering